Equipment dispatch

Step deck dispatch, with permits as your own line

Updated

A step deck carries what will not fit under a bridge on a flat deck, and some of that freight needs permits. This site never estimates a permit cost: it is a line you enter from what you paid. On the EXAMPLE week below, with an entered permit line, the fee is $483.00 and $3,159.44 is left.

Side elevation, not to scale.

Apply for step deck dispatch

About 60 seconds
Trucks
MC active 6 months or more?
Equipment: Step deck. Run more than one type? Say so on the call.
No setup fee, no minimums, month-to-month. You approve every load.
Own active MC only. By sending you agree to the Terms and Privacy Policy.

What step deck dispatch looks like

Step deck work sits between flatbed and heavy haul. The lower deck buys height, so the freight is machinery, tall crates, equipment that would be over height on a flat. The dispatcher's job is measuring before booking: the load's height against your lower deck, its length against the deck you have, and whether a permit is in play.

The dispatcher looks on the boards and through the team's direct contracts with shippers and brokers. Equipment dealers and manufacturers who ship tall freight often call carriers they already use, which is where direct contracts can bring a step deck better-paying loads. It is an effort; nobody can promise the rate. The rate confirmation comes to you, and you sign it.

Cost lines that are different on a step deck

Step deck compared with the baseline dry van sheet
LineWhat is differentHow it shows on the sheet
PermitsSome tall or wide loads need themA line you enter yourself from what you paid
Securement gearChains, binders, straps, edge protectionA weekly gear reserve
Fixed costsStep deck trailers and ramps cost more than a vanA larger monthly figure
FuelHeavier, taller loads can lower mpgA larger fuel line per mile

An EXAMPLE step deck week

The inputs are EXAMPLE figures, and the permit line is entered, not estimated.

EXAMPLE inputs. Illustrative, not market figures.
InputEXAMPLE value
Linehaul gross for the week$6,900.00
Total miles, loaded plus empty2,450
Fuel economy6 mpg
Diesel price$4.05 a gallon
Fixed costs$4,300.00 a month
Maintenance and tires reserve17 cents a mile
Tolls and other$40.00 a week
Where this week's gross goesStep deck week, $6,900.00 gross. Point at a piece of the bar, or step through the rows.
EXAMPLE
Take-home before tax$3,159.44$6,900.00 minus every line, 45.8% of gross
For comparison: Dry van week, $5,800.00 gross, keeps 46.6%

Fee: $6,900 x 7 / 100 = -$483.00. Fuel: 2,450 miles / 6.0 mpg x $4.05 = -$1,653.75. Fixed: $4,300 a month x 12 / 52 = -$992.31. Then the two lines a van does not have: permits -$120.00 and gear -$35.00.

Take-home: $3,159.44. That is $1.29 a mile and 45.8% of gross.

Put this step deck week in the simulator; the permit and gear lines are folded into "tolls and other" there.

What the dispatcher handles on a step deck week

  • Load dimensions checked against your deck lengths and heights before anything is offered.
  • Permit responsibility confirmed in writing: who buys it, who pays it, and that it is on the rate confirmation.
  • Ramps, dunnage and tarp needs passed along.
  • Loading and unloading times checked, since equipment shippers often load by crane or forklift on a schedule.
  • Detention logged and claimed when a load is not ready.
  • A reload lined up near the drop, and the weekly earnings report.

The full week is on how a week runs.

The fee line and the terms

7% of gross load pay for one truck, with permit reimbursement and other accessorials in gross. The schedule for larger carriers is on the fee page.

The fee line, step deckOf every $100 the truck grosses, $7 is the fee. Accessorials count. A week the truck sits costs $0.
Fee at 7%
-$483.00
Gross after the fee
$6,417.00
$6,900 x 7 / 100 = $483.00. Fuel and your bills still come out after this.
setup fee
$0
minimum loads or weeks
0
at a time, month-to-month
1 mo
days notice to cancel
30
fee in a week the truck sits
$0
Terms of the dispatch service
TermDetail
Setup feeNone.
MinimumsNone. No minimum loads, weeks or gross.
Contract lengthMonth-to-month.
Cancellation30 days notice.
When the fee appliesOnly on loads hauled. If the truck sits, the fee is zero.
Who approves loadsThe carrier approves every load before it is booked.

See flatbed dispatch for open-deck freight at standard height, or hotshot dispatch for lighter open-deck work. All seven are on the equipment index.

Questions carriers ask

Why does this site not estimate permit costs for step deck loads?

Because permit costs depend on the state, the route, the dimensions and the date, and a guessed figure on a settlement sheet is worse than an empty line. Enter what the permit actually cost you. The dispatcher will confirm with you who pays for permits on each load.

Does the dispatcher book oversize step deck loads?

Only if you tell the dispatcher you run them, carry the equipment, and handle the permits or want the load to include them. Many step deck weeks are legal-size tall freight that needs no permit at all.

Is the fee different for a step deck?

No. One truck pays 7% of gross load pay whatever the trailer. Permit reimbursements or permit pay built into the rate are part of gross, and the fee applies to them like any other money on the invoice.

What should I tell the dispatcher about my step deck?

Upper and lower deck lengths, deck heights, whether you have ramps, your tarps and securement, and which permit loads you will and will not take. Loads are matched to those numbers before any are offered.

Next mile

The short form at the top already has step deck picked. Six answers, about a minute.

Apply for dispatch